My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF INC 12/16/2014
>
Contracts
>
Agreement
>
KPFF INC 12/16/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 1:29:22 PM
Creation date
8/21/2019 1:28:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF INC
Approval Date
12/16/2014
Council Approval Date
12/3/2014
Department
Administration
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge Design
Tracking Number
0001970
Total Compensation
$1,750,000.00
Contract Type
Agreement
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase 1A — Utility Bridge <br /> 1. Project Management and Administration <br /> This task will cover all management associated with the utility bridge work. <br /> 2. Topographic and Boundary Survey <br /> The survey task is to create a base map for the utility bridge project design. <br /> 3. Geotechnical Investigation and Recommendations <br /> This task is to do the work necessary to develop geological recommendations and a <br /> geotechnical discipline report for the design of the utility bridge. <br /> 4. Structural Engineering <br /> Work associated with Utility Bridge includes all work on the uplands side of the bridge, the <br /> utilities crossing the bridge, the utilities approximately 50-feet beyond the west bridge <br /> landing, the site work associated with the west landing and the undergrounding of overhead <br /> utilities in conflict with the bridge. <br /> 5. Civil Engineering <br /> The design shall include the bridge superstructure and foundations from the abutment near <br /> the Grand Avenue Park, over BNSF and SR529 and ending at an elevator/stairway support <br /> structure on the Port of Everett property. <br /> 6. Combined Sewer and Stormwater Coordination <br /> Work will include conceptual planning of the combined sewer outfall and stormwater sewer <br /> routing to PSO3. Hydraulic design criteria, pressure rating, and recommended pipe size for <br /> the combined sewer outfall and stormwater outfall pipe crossings of the proposed Grand <br /> Avenue Park Bridge shall be provided. <br /> 7. Architecture and Bridge Aesthetics Collaboration <br /> This task is to develop the aesthetic components of the utility bridge geometry, materials <br /> and details. <br /> 8. Electrical Engineering <br /> The electrical work associated with this task will be to provide lighting for the utility bridge. <br /> 9. Landscape Architecture and Irrigation Design <br /> For the utility bridge portion of the project, the scope will include the design of site work <br /> including pedestrian paving, site furnishings, conceptual site grading, soil preparation in <br /> planting areas, planting and irrigation associated with the return of the site to the condition <br /> prior to construction. <br /> 10. BNSF Support <br /> Support will include coordination with BNSF and work associated with the BNSF review <br /> process for the utility bridge. <br /> 11. Public Outreach <br /> The team will assist the City in developing and implementing a public outreach program. <br /> 12. Environmental Services <br /> These services include the permitting effort for the SEPA, ECS, Section 4(f), BA, JARPA <br /> and cultural resource documents associated with the utility bridge. <br /> KPFF Consulting Engineers Page 2 <br /> Grand Avenue Park Bridge Scope of Work November 10, 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.