My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF INC 12/16/2014
>
Contracts
>
Agreement
>
KPFF INC 12/16/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 1:29:22 PM
Creation date
8/21/2019 1:28:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF INC
Approval Date
12/16/2014
Council Approval Date
12/3/2014
Department
Administration
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge Design
Tracking Number
0001970
Total Compensation
$1,750,000.00
Contract Type
Agreement
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TEAM <br /> The project team is made up of the following: <br /> Owner City of Everett <br /> Prime Consultant KPFF Consulting Engineers, Inc. <br /> David McMullen, Design Team Project Manager <br /> Structural Engineering KPFF Consulting Engineers, Inc <br /> Civil Engineering KPFF Consulting Engineers, Inc <br /> Surveying KPFF Consulting Engineers, Inc <br /> Geotechnical Engineering HWA GeoSciences, Inc. <br /> Bridge Architecture LMN Architects <br /> Environmental Services Landau Associates <br /> CSO Regulator& Sewer M Study HDR <br /> Electrical Engineering Sparling (Candela) <br /> Elevator Design The GreenBusch Group, Inc. <br /> Mechanical Tres West Engineers <br /> Landscape Architecture Swift Company, LLC <br /> Irrigation Design Swift Company, LLC <br /> PROJECT SUBMITTAL LIST <br /> For project submittals, subconsultants shall provide electronic documents to KPFF. KPFF shall <br /> produce and provide the City with hard copies of the submittal documents identified below. <br /> Geotechnical and Environmental documents are an exception; hard copies of these submittal <br /> items shall be produced as outlined below by HWA and Landau and provided to KPFF for <br /> submission to the City. Unless otherwise noted, the term electronic refers to PDF format. KPFF <br /> shall perform QA/QC processes on all documents prior to submittal to the City. Submittal <br /> documents shall be inclusive of the project as a whole, and will not be divided into separate <br /> submittals corresponding to their respective project phases. <br /> Surveying Submittals (Produced by KPFF for Phase 1A and Phase 2) <br /> Surveying Submittal documents shall be provided and coordinated per the City of Everett <br /> Standards. This submittal includes two (2) notebook deliverables, each accompanied by a CD <br /> containing electronic files. <br /> • Electronic files (PDF and CAD) <br /> • Field notes <br /> • Raw data files <br /> • One (1) hard copy plot <br /> TS&L Submittals (Produced by KPFF and LMN for Phase 1A and Phase 1 B) <br /> All TS&L Submittals include six (6) hard copies, and one (1) electronic copy. <br /> • Draft TS&L Report <br /> • Final TS&L Report <br /> KPFF Consulting Engineers Page 5 <br /> Grand Avenue Park Bridge Scope of Work November 10, 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.