My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF INC 12/16/2014
>
Contracts
>
Agreement
>
KPFF INC 12/16/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 1:29:22 PM
Creation date
8/21/2019 1:28:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF INC
Approval Date
12/16/2014
Council Approval Date
12/3/2014
Department
Administration
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge Design
Tracking Number
0001970
Total Compensation
$1,750,000.00
Contract Type
Agreement
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Reports (Produced by HWA for Phase 1A and Phase 2) <br /> All Geotechnical Submittals include one (1) electronic copy <br /> • Field Investigation Memo (2 hard copies) <br /> • BNSF Field Investigation Memo (2 hard copies) <br /> • Draft Preliminary geotechnical report (3 hard copies) <br /> • Draft/Final Soil and Geology Discipline report (3 hard copies) <br /> • Final Geotechnical Report (3 hard copies) <br /> Environmental Phase 1A (Produced by Landau for Phase 1A) <br /> All Phase 1A Environmental Submittals include one (1) electronic copy. <br /> • Draft SEPA Checklist (MS Word) <br /> • Final SEPA Checklist (1 hard copy) <br /> • Preliminary ECS <br /> • Final ECS <br /> • Decision matrix <br /> • Draft and final Environmental Justice letter to file. <br /> • Draft and final technical memorandum <br /> Environmental Phase 2 (Produced by Landau for Phase 2) <br /> All Phase 2 Environmental Submittals include one (1) electronic copy. <br /> • Draft BA and EFH Evaluation Report <br /> • Final BA and EFH (3 hard copies) <br /> • APE letter (MS Word) and associated figure (PDF) <br /> • Draft Cultural Resources report <br /> • Final Cultural Resources report (Includes CD and 6 hard copies) <br /> • Draft JARPA for review and approval <br /> • Final JARPA (3 hard copies) <br /> • Draft Screening-Level Hazardous Materials and Environmental Assessment technical <br /> memorandum (MS Word) <br /> • Final Screening-Level Hazardous Materials and Environmental Assessment technical <br /> memorandum (PDF) <br /> • Draft CMMP (MS Word) <br /> • Final CMMP (PDF) <br /> Combined Sewer and Stormwater (Produced by HDR for Phase 1A and Phase 2) <br /> Submittals below include one (1) electronic copy. <br /> • Draft Outfall Improvements Technical Memorandum (Phase 1A - Task 7; 2 hard copies) <br /> • Final Outfall Improvements Technical Memorandum (3 hard copies) <br /> • Draft CSO Regulator Structure Basis of Design (Phase 2 —Task 26; 2 hard copies) <br /> • Final CSO Regulator Structure Basis of Design (3 hard copies) <br /> • <br /> BNSF Submittals (Produced by KPFF for Phase 1A and Phase 1 B) <br /> All BNSF Submittals include four (4) hard copies and one (1) electronic copy of each document. <br /> • Conceptual BNSF Submittal <br /> o Plan, Elevation and Typical Section (11x17) <br /> o Photos of Site <br /> KPFF Consulting Engineers Page 6 <br /> Grand Avenue Park Bridge Scope of Work November 10, 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.