Laserfiche WebLink
Geotechnical Reports (Produced by HWA for Phase 1A and Phase 2) <br /> All Geotechnical Submittals include one (1) electronic copy <br /> • Field Investigation Memo (2 hard copies) <br /> • BNSF Field Investigation Memo (2 hard copies) <br /> • Draft Preliminary geotechnical report (3 hard copies) <br /> • Draft/Final Soil and Geology Discipline report (3 hard copies) <br /> • Final Geotechnical Report (3 hard copies) <br /> Environmental Phase 1A (Produced by Landau for Phase 1A) <br /> All Phase 1A Environmental Submittals include one (1) electronic copy. <br /> • Draft SEPA Checklist (MS Word) <br /> • Final SEPA Checklist (1 hard copy) <br /> • Preliminary ECS <br /> • Final ECS <br /> • Decision matrix <br /> • Draft and final Environmental Justice letter to file. <br /> • Draft and final technical memorandum <br /> Environmental Phase 2 (Produced by Landau for Phase 2) <br /> All Phase 2 Environmental Submittals include one (1) electronic copy. <br /> • Draft BA and EFH Evaluation Report <br /> • Final BA and EFH (3 hard copies) <br /> • APE letter (MS Word) and associated figure (PDF) <br /> • Draft Cultural Resources report <br /> • Final Cultural Resources report (Includes CD and 6 hard copies) <br /> • Draft JARPA for review and approval <br /> • Final JARPA (3 hard copies) <br /> • Draft Screening-Level Hazardous Materials and Environmental Assessment technical <br /> memorandum (MS Word) <br /> • Final Screening-Level Hazardous Materials and Environmental Assessment technical <br /> memorandum (PDF) <br /> • Draft CMMP (MS Word) <br /> • Final CMMP (PDF) <br /> Combined Sewer and Stormwater (Produced by HDR for Phase 1A and Phase 2) <br /> Submittals below include one (1) electronic copy. <br /> • Draft Outfall Improvements Technical Memorandum (Phase 1A - Task 7; 2 hard copies) <br /> • Final Outfall Improvements Technical Memorandum (3 hard copies) <br /> • Draft CSO Regulator Structure Basis of Design (Phase 2 —Task 26; 2 hard copies) <br /> • Final CSO Regulator Structure Basis of Design (3 hard copies) <br /> • <br /> BNSF Submittals (Produced by KPFF for Phase 1A and Phase 1 B) <br /> All BNSF Submittals include four (4) hard copies and one (1) electronic copy of each document. <br /> • Conceptual BNSF Submittal <br /> o Plan, Elevation and Typical Section (11x17) <br /> o Photos of Site <br /> KPFF Consulting Engineers Page 6 <br /> Grand Avenue Park Bridge Scope of Work November 10, 2014 <br />