My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF INC 12/16/2014
>
Contracts
>
Agreement
>
KPFF INC 12/16/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 1:29:22 PM
Creation date
8/21/2019 1:28:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF INC
Approval Date
12/16/2014
Council Approval Date
12/3/2014
Department
Administration
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge Design
Tracking Number
0001970
Total Compensation
$1,750,000.00
Contract Type
Agreement
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 30 Percent BNSF Submittal <br /> o 30% level plan set (11x17) <br /> o Draft Specifications <br /> o Drainage Report <br /> o Construction Phasing Plan <br /> o Response to BNSF Conceptual Submittal Comments <br /> • 100 Percent (Final) PSE Submittal <br /> o 100% level plan set (11x17) <br /> o Final Specifications <br /> o Drainage Report <br /> o Construction Phasing Plan <br /> o Response to BNSF 100% Conceptual Submittal Comments <br /> PSE Submittals <br /> Phase 1A Produced by KPFF, LMN, Sparling, and Swift. <br /> Phase 1B Produced by KPFF, LMN, Sparling, Greenbusch, Tres West, and Swift. <br /> Phase 2 Produced by KPFF, HDR, and Swift <br /> All PSE Submittals include three (3) hard copies and one (1) CD that contains both the original <br /> source electronic files (Word, Excel, CAD, etc.) and a PDF copy of each document. Final <br /> specifications shall be a bid ready set including general and special provisions. For the final <br /> submittal, KPFF shall also submit a single complete set of full size wet signed drawings. Each <br /> Subconsultant shall be responsible for providing KPFF with the above mentioned documents, <br /> respective to their firm's effort. <br /> • 30 Percent PSE Submittal <br /> o Draft Basis of Design <br /> o Preliminary Drainage Report (KPFF Civil Only) <br /> o 30% Level Plan Set (11x17) <br /> o Preliminary Estimated Quantities and Associated Costs <br /> • 60 Percent PSE Submittal <br /> o Final Basis of Design <br /> o Final Draft Drainage Report (KPFF Civil) <br /> o 60% Level Plan Set (11x17) <br /> o Draft Technical Specifications <br /> o Updated Estimated Quantities and Associated Costs <br /> o Response to City 30% PSE Comments <br /> • 90 Percent PSE Submittal <br /> o 90% Level Plan Set (11x17) <br /> o Updated Technical Specifications <br /> o Updated Estimated Quantities and Associated Costs <br /> o Response to City 60% PSE Comments <br /> • 100 Percent (Final) PSE Submittal <br /> o Final plan set <br /> o Final Specifications <br /> o Finalized Estimated Quantities and Associated Costs <br /> o Response to City 90% PSE comments <br /> KPFF Consulting Engineers Page 7 <br /> Grand Avenue Park Bridge Scope of Work November 10, 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.