My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF INC 12/16/2014
>
Contracts
>
Agreement
>
KPFF INC 12/16/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 1:29:22 PM
Creation date
8/21/2019 1:28:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF INC
Approval Date
12/16/2014
Council Approval Date
12/3/2014
Department
Administration
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge Design
Tracking Number
0001970
Total Compensation
$1,750,000.00
Contract Type
Agreement
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Deliverables (per Project Submittal List) <br /> • Field Investigation Memo <br /> • BNSF Field Investigation Memo <br /> • Draft Preliminary geotechnical report <br /> • Draft/Final Soil and Geology Discipline report <br /> 3.5 — Final Design Geotechnical Engineering Services <br /> 3.51 — Final Design Engineering Analysis <br /> HWA shall provide final design engineering services. This shall include updating the <br /> engineering evaluations completed during the preliminary engineering evaluations to reflect the <br /> design alternatives selected to move forward as part of final design. <br /> 3.52 — Final Geotechnical Report <br /> HWA's final geotechnical report shall contain the results of the geotechnical engineering <br /> investigation, including description of surface and subsurface conditions; a site plan showing <br /> exploration locations and other pertinent features; summary boring logs; and laboratory test <br /> results. The report shall provide a narrative and geotechnical recommendations for each of the <br /> above described geotechnical aspects of the project. <br /> 3.53 — Respond to Geotechnical Related Review Comments <br /> HWA shall provide written responses to review comments on the 30, 60 and 90 percent plans. <br /> The written responses shall be provided in the form of emails to the design team. <br /> 3.54 —Attend Proiect Coordination Meetings <br /> HWA shall participate in monthly project coordination meetings through the final design process. <br /> These meetings shall be held at KPFF's Seattle office from October of 2014 to August 2015 (11 <br /> coordination meetings). <br /> 3.55 — Geotechnical Plan and Specification Review <br /> HWA shall collaborate with KPFF and the City of Everett to verify that the geotechnical <br /> engineering requirements are properly incorporated into the plans and specifications. <br /> 3.56 — Respond to Geotechnical Related Pre-Bid Questions <br /> HWA shall provide written responses to geotechnical questions posed by prospective <br /> contractors. The written responses shall be provided in the form of emails to the design team. <br /> 3.57 —Task Management <br /> HWA shall prepare monthly invoices and progress reports for submittal to KPFF. <br /> Assumptions <br /> No additional geotechnical explorations will be required as part of final design. <br /> Deliverables <br /> Final Geotechnical Report per the Project Submittal List <br /> KPFF Consulting Engineer November 10, 2014 <br /> Grand Avenue Park Utility Bridge, Phase 1A Page 15 of 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.