Laserfiche WebLink
Survey and Mapping <br /> • Preliminary base map complete <br /> • Preliminary right-of-way plan complete <br /> Utilities <br /> • Preliminary utility conflicts identified <br /> • Relocation alternatives and schedule constraints from utilities <br /> • Franchise and permit process initiated <br /> • Utility property rights identified <br /> Report Format <br /> • Cover, Title Sheet, and Index <br /> • Executive Summary <br /> • Introduction <br /> • Project Description <br /> • Design Criteria <br /> • Conceptual Studies <br /> o Aesthetics <br /> o Site constraints <br /> o Regulatory constraints <br /> o Construction requirements <br /> o Foundations <br /> o Urban design <br /> o Structure types <br /> o Approach styles <br /> o Maintenance <br /> • Project alternatives <br /> • Cost estimates (PE, ROW, Inspection, Construction) <br /> • Appendices <br /> o Photographs <br /> o Workshop Meeting Minutes <br /> o Technical Memorandums <br /> Deliverables <br /> • Draft and Final TS&L Repor per Project Submittal Listt <br /> 4.4— Final PSE Design <br /> KPFF shall provide structural engineering for the final PSE design for the selected preferred <br /> pedestrian bridge. KPFF shall also support the City during the contractor bid process. <br /> Deliverables <br /> • Plans per Project Sheet List <br /> • PSE documents per Project Submittal List <br /> KPFF Consulting Engineer November 10, 2014 <br /> Grand Avenue Park Utility Bridge, Phase 1A Page 17 of 55 <br />