My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF INC 12/16/2014
>
Contracts
>
Agreement
>
KPFF INC 12/16/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 1:29:22 PM
Creation date
8/21/2019 1:28:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF INC
Approval Date
12/16/2014
Council Approval Date
12/3/2014
Department
Administration
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge Design
Tracking Number
0001970
Total Compensation
$1,750,000.00
Contract Type
Agreement
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Grading for landings and street improvements. Grading will include both spot elevations <br /> and contours necessary for construction. KPFF will provide wall elevation profiles and top <br /> and bottom of wall elevations on plans. <br /> • Utility relocations necessary for the construction of the proposed improvements. KPFF will <br /> provide water service extensions necessary for irrigation. <br /> • Route 36-inch Public Storm Sewer from connection with Sewer "M" Project in Grand Avenue <br /> to approximately 50-feet beyond west bridge landing, see Exhibit H for project limits. <br /> • Route 30-inch CSO pipe extension from connection with Sewer "M" Project in Grand Avenue <br /> to approximately 50-feet beyond west bridge landing; see Exhibit H for project limits. <br /> • Route a force main (dry) together with storm and combined sewer pipes, except this force <br /> main will be capped at 16th and Grand for future extension with the Sewer "M" Project. This <br /> force main will be extended north to 50 feet within this Phase 1, and extended further north <br /> to the lift station under Phase 2. <br /> • Under the Utility/Pedestrian Bridge, include allocated spaces for a water main pipe for future <br /> installation by City of Everett under a separate contract. <br /> • Traffic Control Plan for basis of bid in Grand Ave and W. Marine View Drive for the <br /> installation of the Utility/Pedestrian Bridge and utilities. <br /> • Undergrounding of overhead power distribution cables, beneath the Utility/Pedestrian Bridge <br /> in West Marine View Drive, will be accomplished in a separate infrastructure design of duct <br /> banks & vaults by KPFF with Snohomish County PUD guidance and meeting PUD design <br /> requirements. Once the infrastructure design has been approved by PUD, the infrastructure <br /> package will be sent out as an early bid package ahead of the Utility Bridge Package. PUD <br /> will be responsible to underground the conductors in the new infrastructure facilities. <br /> • Undergrounding of overhead communication cables, beneath the Utility/Pedestrian Bridge in <br /> West Marine View Drive. This task effort will include infrastructure design of duct banks and <br /> vaults coordinated with, and meeting the requirements of, the utility purveyors. The <br /> communication infrastructure will be part of the power undergrounding and will be bid at the <br /> same time. <br /> • Street improvement plans for Grand Avenue, and West Marine View Drive associated with <br /> the utility relocation and installations. The plans are comprehensive showing paving, <br /> drainage, utilities and horizontal control for elements designed by others, such as <br /> landscaping and street lighting. KPFF will provide standard MUTCD street signage and <br /> channelization for utility street restoration. Specifically, the street improvement scope is as <br /> follows: <br /> o Improvements to Grand Avenue are confined to the intersection with 16th Street. <br /> Specifically, providing curb, sidewalk and pavement replacement for installation of storm <br /> and utility systems and improvements to park areas disturbed with construction. No <br /> other improvements to Grand Avenue or 16th Street are anticipated, such as drainage, <br /> lighting, etc. <br /> o Improvements to West Marine View Drive are confined to repairs to existing street <br /> pavement, curb and sidewalk for installation of Storm and CSO systems, stubbed out <br /> force main, power and communication overhead to underground and potential relocation <br /> of existing street utilities to accommodate the new systems. No other improvements are <br /> anticipated, such as drainage, utilities, lighting, etc. <br /> In addition, KPFF will prepare cost estimates for civil design elements utilizing our cost <br /> database, City, County and WSDOT bid tabs and contacting contractors to verify major cost <br /> elements. The cost estimating effort includes a budget reconciliation effort with the City and <br /> design team prior to moving on to the next design phase. <br /> KPFF Consulting Engineer November 10, 2014 <br /> Grand Avenue Park Utility Bridge, Phase 1A Page 19 of 55 <br />