Laserfiche WebLink
Submittals to City of Everett <br /> PHASE 1A - UTILITY BRIDGE 30% 60% 90% 100% <br /> CIVIL +/-30 <br /> Task No. 5; KPFF Sheets <br /> Bridge And Landings <br /> C-XXX Civil Legend and Abbreviations X X X X <br /> C-XXX Civil Notes X X X X <br /> C-XXX General Site Plan X X X X <br /> C-XXX Horizontal Control Plan (Alignment) X X X X <br /> C-XXX Bridge and landings Alignment Profile X X X X <br /> C-XXX Existing Conditions Site Demolition Plan X X X <br /> C-XXX Temporary Erosion and Sediment Control Plan X X X <br /> C-XXX Temporary Erosion and Sediment Control Details X X X <br /> C-XXX Grand Ave Landing Horizontal Control & Paving Plan X X X X <br /> C-XXX West Landing Horizontal Control & Paving Plan X X X X <br /> C-XXX Horizontal Control Enlargement Plan X X X X <br /> C-XXX Paving Sections and Details X X X <br /> C-XXX Grand Avenue Landing Grading and Drainage Plan X X X X <br /> C-XXX West Landing Grading & Drainage Plan X X X X <br /> C-XXX Grading/Site/Walls Sections at Park Areas X X X X <br /> C-XXX Grading and Site Sections X X X X <br /> C-XXX Drainage Sections and Details X X X <br /> C-XXX Grand Avenue Landing Utility Plan X X X X <br /> C-XXX W. Marine View Dr. Landing Utility Plan X X X X <br /> C-XXX Force main utility plan, profile and details X X X <br /> C-XXX Storm and Utility Profiles, Sections and Details X X X <br /> C-XXX BNSF supplemental civil drawings packaged with bridge X X X X <br /> structural drawings. <br /> Street Related Work Plans <br /> C-XXX Cover Sheet X X X X <br /> C-XXX Notes/Abbreviations X X X X <br /> C-XXX Traffic Control Plan X X X X <br /> C-XXX Traffic Control Sections and Details X X X <br /> C-XXX Power & Communications Underground Overhead X X X X <br /> cables-Plan and Profile <br /> C-XXX Power & Communications Underground Overhead X X X <br /> cables-Sections, Details and Notes. <br /> C-XXX Grand Avenue Utilities Plan and Profile X X X X <br /> C-XXX Channelization, Signage and Horizontal Control Plan X X X X <br /> KPFF Consulting Engineer November 10, 2014 <br /> Grand Avenue Park Utility Bridge, Phase 1A Page 22 of 55 <br />