My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF INC 12/16/2014
>
Contracts
>
Agreement
>
KPFF INC 12/16/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 1:29:22 PM
Creation date
8/21/2019 1:28:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF INC
Approval Date
12/16/2014
Council Approval Date
12/3/2014
Department
Administration
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge Design
Tracking Number
0001970
Total Compensation
$1,750,000.00
Contract Type
Agreement
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gardner Wet Weather Control Facility. The design concepts include piping systems, <br /> diversion structures, motor operated control gates and system monitoring equipment. <br /> • Meet with the City and if requested, the Washington State Department of Ecology (DOE), to <br /> review flow routing and the interface with the existing NPDES (National Pollution Discharge <br /> Elimination System) permitted CSO outfalls. <br /> • Evaluate the need for odor control at the new facilities and provide recommendations if <br /> necessary. <br /> • Summarize the design recommendations in a brief technical memorandum (less than 5 <br /> pages plus figures) to document design concepts. <br /> Assumptions <br /> • The City or the City's consultant will provide the current InfoSWMM model for the Sewer M <br /> project area. <br /> • One meeting with the City's consultant and City staff to discuss the Sewer M Project. <br /> • PSO3 will be replaced in its entirety. The design of the outfall replacement will be <br /> performed by KPFF. <br /> • No outfall dispersion modeling is included. <br /> • Figures in the technical memorandum will be based on GIS mapping. <br /> • This effort does not cover other design considerations of the stormwater and CSO piping on <br /> the bridge such as seismic or surge design. <br /> Deliverables <br /> • Draft and Final Outfall Improvements Technical Memorandum per Project Submittal List. <br /> 7. Architecture and Bridge Aesthetics Collaboration (LMN) <br /> 7.1 — Project Management <br /> The KPFF design team shall participate in team meetings to coordinate project issues, <br /> schedule, progress, and general direction of effort as needed. Effort identified under this task <br /> also includes attendance at KPFF design team coordination meetings involving the City. <br /> 7.2 — Bridge Design <br /> LMN shall collaborate with the team on the design development and phasing for the bridge <br /> structure, aesthetic and functionality of the span and approaches and will provide <br /> documentation supporting the PSE effort. This will include further refinement of the architectural <br /> definition of the bridge geometry, materiality and connection details, pier shape and finishes. <br /> The team will consider future accommodation of pedestrian features such as: deck, handrails, <br /> and throw barrier. <br /> 7.21 — Schematic Design and Coordination (30%) <br /> LMN shall refine the conceptual preferred alternative established in the Feasibility Study phase. <br /> LMN shall document, in drawings, overall schematic and phasing design for the 30% PSE <br /> submittal. CAD conversion will not include intelligent tagging. LMN shall coordinate the <br /> development of the following components: <br /> • Phasing concept <br /> • Truss Geometry and Materiality <br /> • Lighting Coordination <br /> • Future accommodation of: <br /> KPFF Consulting Engineer November 10, 2014 <br /> Grand Avenue Park Utility Bridge, Phase 1A Page 24 of 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.