Laserfiche WebLink
• Bridge deck <br /> • Eastern approach and connections, park integration <br /> • Western stair/elevator approach and street and waterfront connections <br /> • Handrail system <br /> • Throw Barrier <br /> 7.22 — Design Development and Coordination (60%-100%) <br /> LMN shall provide architectural design and documentation services for the utility and pedestrian <br /> bridge and east and west approaches for the 60, 90, and 100 Percent PSE Submittals. Work <br /> shall include refinement of the Draft Basis of Design, coordinating the architectural design with <br /> associated engineering disciplines, phased construction documentation of the architectural <br /> components of the design. CAD conversion at each milestone will not include intelligent <br /> tagging. <br /> 7.23 — Review/Response to City Comments <br /> LMN will review written city comments, and will provide written responses to city comments. <br /> Deliverables <br /> • Design Development Graphics <br /> o Phasing Diagrams <br /> o Overall Concept Sketches <br /> o West Approach Sketches <br /> o East Approach Sketches <br /> o Connection Detail Sketches <br /> • Preferred Alternative Graphics <br /> o (1) One Physical Study level model <br /> o (3) Three renderings <br /> • Plans per the Project Sheet List <br /> • PSE Submittal Documents per the Project Submittal List <br /> PHASE 1A - UTILITY BRIDGE Submittals to City of Everett <br /> 30% 60% 90% 100% <br /> ARCHITECTURE +1-9 <br /> Sheets <br /> Task No. 7; LMN <br /> A-001 Codes, Notes and Symbols X X X X <br /> A-100 Enlarged East Approach Site Plan - Phase 1A Utility bridge X X X X <br /> A-102 Enlarged Typical Bridge Plan - Phase 1A Utility bridge X X X X <br /> A-104 Enlarged West Approach Site Plan - Phase 1A Utility bridge X X X X <br /> A-200+ Enlarged Truss Geometry Elevations and Axons Phase 1A X X X X <br /> A-205 Enlarged Truss Sections and Elevations Phase 1A X X X X <br /> A-207 Enlarged East Landing Sections and Elevations Phase 1A X X X <br /> A-209 Enlarged West Landing Section and Elevations Phase 1A X X X <br /> KPFF Consulting Engineer November 10, 2014 <br /> Grand Avenue Park Utility Bridge, Phase 1A Page 25 of 55 <br />