My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF INC 12/16/2014
>
Contracts
>
Agreement
>
KPFF INC 12/16/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 1:29:22 PM
Creation date
8/21/2019 1:28:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF INC
Approval Date
12/16/2014
Council Approval Date
12/3/2014
Department
Administration
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge Design
Tracking Number
0001970
Total Compensation
$1,750,000.00
Contract Type
Agreement
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Submittals to City of Everett <br /> PHASE 1A - UTILITY BRIDGE 30io 60i 90i loo°ro <br /> ELECTRICAL <br /> 12Sheets <br /> Task No. 8; Sperling <br /> E-XXX Legend and Abbreviations X X X X <br /> E-XXX Electrical Demolition Site X X X X <br /> E-XXX Electrical Site Plans X X X X <br /> E-XXX Communication, Primary and Secondary X X X <br /> Conduit/Vault Infrastructure <br /> E-XXX Bridge Lighting Plan X X X <br /> E-XXX Bridge Electrical Plan X X X <br /> E-XXX Bridge Utility Crossing System Plan X X X <br /> E-XXX Electrical Details X X X <br /> E-XXX Lighting Details X X X <br /> E-XXX One Lines and Panel Schedules X X X <br /> 9. Landscape Architecture & Irrigation Design (Swift) <br /> Swift Company LLC shall be providing urban design and landscape architecture including <br /> pedestrian hardscape from back side of curb including paving, and furnishings; planting soil, <br /> landscape planting and irrigation design documents, technical specifications, and construction <br /> details for all landscape areas of this project. These final plans and specification will be <br /> prepared in City of Everett preferred format with specific bid items to be determined in the <br /> future. Extent of project shall be: <br /> • Top of Bridge: Assume the park area and slope to BNSF from 16th Street to 17th Street, <br /> including the intersection of 16th and Grand Avenue. <br /> • Bottom of Bridge: Assume the area from the edge of the existing finished parking lot for <br /> the Lombardi Restaurant to the Phase 1 boundary location. <br /> For the Utility Bridge portion of the project, the scope will include site work associated with the <br /> return of the site to the condition prior to construction. Swift Company LLC shall prepare a <br /> conceptual site plan indicating landscape plantings, bike route influences, streetscape, <br /> hardscape and pedestrian improvements including furnishings as required elements for the City <br /> of Everett and Port of Everett review, as well as in response to program elements defined by the <br /> owner. Swift Company LLC shall be responsible for the design, documentation including <br /> drawings and specifications, cost estimating and construction administration for the following <br /> elements: <br /> • Hardscape including pedestrian paving from back side of curbs, furnishings, planting soil <br /> preparation, planting, mulch, and irrigation with associated schedules <br /> • Provide horizontal control of above improvements <br /> • Prepare conceptual grading for scope area with final documentation starting at 60% phase <br /> by Civil Engineer <br /> KPFF Consulting Engineer November 10, 2014 <br /> Grand Avenue Park Utility Bridge, Phase 1A Page 27 of 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.