My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF INC 12/16/2014
>
Contracts
>
Agreement
>
KPFF INC 12/16/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 1:29:22 PM
Creation date
8/21/2019 1:28:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF INC
Approval Date
12/16/2014
Council Approval Date
12/3/2014
Department
Administration
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge Design
Tracking Number
0001970
Total Compensation
$1,750,000.00
Contract Type
Agreement
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9.3 — 60 Percent PSE <br /> Swift Company LLC shall provide 60%; level plans and specifications per the following list which <br /> details the Project's construction requirements. The purpose of the 60% design phase is to <br /> confirm the concept design and establish all project design elements with enough <br /> documentation to feel confident in the cost estimate and coordination with all stakeholders and <br /> design team members. This set will be used for submittal for initial permit reviews. <br /> Deliverables (Electronic copy to KPFF) <br /> • 60 Percent PSE Submittal <br /> o Plans per the Project Sheet List <br /> o Basis of Design, Specifications, and comment responses per the Project Submittal List. <br /> o Unit quantities with an engineer's estimated unit cost (cost estimate) per the Project <br /> Submittal List. <br /> ■ Swift Company LLC shall provide unit costs for items under their design, KPFF will <br /> provide grading and pavement costs. <br /> 9.4—90 Percent PSE <br /> Swift Company LLC shall provide 90%; level plans and specifications per the following list which <br /> details the Project's construction requirements. The purpose of the 90% design phase is to <br /> complete the construction documents and confirm cost estimates. There should be no major <br /> changes to the program and design at this phase. All details will be completed at this state of <br /> design. <br /> Deliverables (Electronic copy to KPFF) <br /> • 90 Percent PSE Submittal <br /> o 90% level plan set per the Project Sheet List. <br /> o Specifications, Cost Estimate, and Comment Responses per the Project Submittal List. <br /> 9.5 — 100 Percent (Final) PSE <br /> Swift Company LLC shall finalize plans and specifications based on 90% review comments and <br /> finalize internal QA/QC. The purpose of this design phase is to finalize the construction <br /> documents for bid. <br /> Deliverables (Electronic copy to KPFF) <br /> • 100 Percent PSE Submittal <br /> o Final plan set per the Project Sheet List. <br /> o Final Specifications, cost estimate, and comment responses per the Project Submittal <br /> List. <br /> KPFF Consulting Engineer November 10, 2014 <br /> Grand Avenue Park Utility Bridge, Phase 1A Page 29 of 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.