My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF INC 12/16/2014
>
Contracts
>
Agreement
>
KPFF INC 12/16/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 1:29:22 PM
Creation date
8/21/2019 1:28:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF INC
Approval Date
12/16/2014
Council Approval Date
12/3/2014
Department
Administration
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge Design
Tracking Number
0001970
Total Compensation
$1,750,000.00
Contract Type
Agreement
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase 1B — Pedestrian Upgrades Scope of Work <br /> 13. Project Management and Administration (KPFF & LMN) <br /> See Task 1 of this Scope of Work for the Project Management and Administration description <br /> and deliverables. Task 13 is for the same work as needed to complete the Pedestrian <br /> Upgrades. <br /> 14. Structural Engineering (KPFF) <br /> See Task 4 of this Scope of work for Structural Engineering description and deliverables. Task <br /> 14 is for the same work as needed to complete the Pedestrian Upgrades. <br /> PHASE 1B - PEDESTRIAN UPGRADES Submittals to City of Everett <br /> 30% 60% 90% 100% <br /> +J-24 <br /> STRUCTURAL Sheets <br /> Task No. 14; <br /> S-XXX West Elevator/Stairway Plan & Elevation X X X X <br /> S-XXX West Elevator/Stairway Foundation Plan & Elevation X X X X <br /> S-XXX West Elevator Details (6 Sheets) X X X <br /> S-XXX West Stairway(6 Sheets) X X X X <br /> S-XXX Typical Section X X X X <br /> S-XXX Superstructure Layout X X X X <br /> S-XXX Bridge Framing Plan X X X X <br /> S-XXX Truss Details X X X <br /> S-XXX Deck Framing Plan & Elevation X X X X <br /> S-XXX Deck Framing Plan X X X X <br /> S-XXX Deck Sections X X X X <br /> S-XXX Deck Details X X X <br /> S-XXX Main Span Handrail Layout& Details (2 Sheets) X X X <br /> 15. Elevator Design (Greenbusch) <br /> 15.1 - Project Management &Administration <br /> This task covers scheduling, contracting, coordination, progress reports, invoicing and up to 6 <br /> meetings within a 50 mile radius of Seattle. <br /> 15.2 — Design Development and Coordination <br /> For 30% PSE Greenbusch shall present Vertical Transportation (VT) options, organize and <br /> communicate VT system and support requirements for each option, coordinate with other <br /> consultants and prepare narrative describing VT options and recommendation(s). <br /> For 60 and 100% PSE Greenbusch shall consolidate VT options, coordinate selected option(s) <br /> with consultants, prepare Design Development level drawings and outline specifications <br /> describing the recommended/selected option(s). <br /> KPFF Consulting Engineer November 10, 2014 <br /> Grand Avenue Park Pedestrian Bridge, Phase 1B Page 42 of 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.