Laserfiche WebLink
Quality Assurance/Quality Control review by Mechanical team members not directly involved <br /> with the project. Engineers cost estimate for the mechanical work. Cost estimate for each <br /> submittal will be based on a combination of historical data and RS Means cost estimating data. <br /> Review and response of Owner and Design team review comments on the submittal <br /> documents. Creating and compiling the data required for the permit submission forms, including <br /> filling out forms and calculations. <br /> Deliverables (Electronic format to KPFF) <br /> • Plans per the Project Sheet List <br /> • Specifications, cost estimates, and calculations per the Project Submittal List <br /> PHASE 1B - PEDESTRIAN UPGRADES Submittals to City of Everett <br /> 30% 60% 90% 100% <br /> +/-XX <br /> MECHANICAL <br /> Sheets <br /> Task No. 16; Tres West <br /> M-XXX Mechanical Legend and Abbreviations X X X X <br /> M-XXX HVAC Ground Floor Plan X X X X <br /> M-XXX HVAC Upper Floor Plan X X X X <br /> M-XXX Mechanical Details X X X X <br /> M-XXX Mechanical Schedules X X X <br /> 17. Architecture and Bridge Aesthetics Collaboration (LMN) <br /> See Task 7 for further description and deliverables of this task. Task 14 is for the same work to <br /> complete the work as needed for the pedestrian upgrades including: further refinement of the <br /> architectural definition of the bridge geometry, materiality and connection details, pier shape and <br /> finishes, bridge deck, lighting, handrails and the railroad throw barrier. <br /> KPFF Consulting Engineer November 10, 2014 <br /> Grand Avenue Park Pedestrian Bridge, Phase 1B Page 44 of 55 <br />