Laserfiche WebLink
PHASE 18 - PEDESTRIAN UPGRADES submittals to City of Everett <br /> 30% 60% 90% 100% <br /> +/-15 <br /> ARCHITECTURE (LMN) - Sheets <br /> Task No. 17; LMN <br /> A-001 Codes, Notes and Symbols X X X <br /> A-101 Enlarged East Approach Site Plan X X X <br /> A-103 Enlarged Typical Bridge Plan X X X <br /> A-105 Enlarged West Approach Site Plan X X X <br /> A-206 Enlarged Truss Sections and Elevations Phase 1B X X X <br /> A-208 Enlarged East Landing Sections and Elevations Phase 1B X X X <br /> A-210 Enlarged West Landing Section and Elevations Phase 1B X X X <br /> A-300 Enlarged East Stair Plan and Section Phase 1B X X X <br /> A-301 Enlarged West Stair Plan and Elevation Phase 1B X X X <br /> A-302 Enlarged Stair Handrail/Guardrail Elevations and Sections X X X <br /> A-400 Handrail/Guardrail Details Phase 1B X X <br /> A-401 Handrail/Guardrail Details Phase 1B X X <br /> A-402 Throw Barrier Details Phase 1B X X <br /> A-404+ Misc Details Phase 1A and 1B X X <br /> 18. Electrical Engineering (Sparling) <br /> See Task 8 of this Scope of work for Electrical Engineering description and deliverables. <br /> Sparling will provide professional electrical engineering services to prepare electrical <br /> construction documents for this project. The electrical work associated with this Task 16 will be <br /> to provide pedestrian lighting throughout the bridge and approaches. <br /> Submittals to City of Everett <br /> PHASE 18 - PEDESTRIAN UPGRADES 30i° 60°i 90°r l00% <br /> ELECTRICAL <br /> Sheets <br /> Task No. 18; Sparling <br /> E-XXX Legend and Abbreviations X X X X <br /> E-XXX Electrical Site Plans X X X X <br /> E-XXX Lighting Site Plans X X X X <br /> E-XXX Bridge Lighting Plan X X X <br /> E-XXX Bridge Electrical Plan X X X <br /> E-XXX Electrical Details X X X <br /> E-XXX Lighting Details X X X <br /> E-XXX One Lines and Panel Schedules X X X <br /> KPFF Consulting Engineer November 10, 2014 <br /> Grand Avenue Park Pedestrian Bridge, Phase 1B Page 45 of 55 <br />