My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF INC 12/16/2014
>
Contracts
>
Agreement
>
KPFF INC 12/16/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 1:29:22 PM
Creation date
8/21/2019 1:28:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF INC
Approval Date
12/16/2014
Council Approval Date
12/3/2014
Department
Administration
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge Design
Tracking Number
0001970
Total Compensation
$1,750,000.00
Contract Type
Agreement
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19. Landscape Architecture and Irrigation Design (Swift) <br /> See Task 9 of this Scope of Work for Landscape Architecture and Irrigation Design description <br /> and deliverables. Swift Company LLC shall be providing urban design and landscape <br /> architecture including pedestrian hardscape from back side of curb including paving, and <br /> furnishings; planting soil, landscape planting and irrigation design documents, technical <br /> specifications, and construction details for all landscape areas of this project. These final plans <br /> and specification will be prepared in City of Everett preferred format with specific bid items to be <br /> determined in the future. Extent of project shall be: <br /> • Top of Bridge: Assume the park area and slope to BNSF from 16th Street to 17th Street, <br /> including the intersection of 16th and Grand Avenue. <br /> • Bottom of Bridge: Assume the area from the edge of the existing finished parking lot for <br /> the Lombardi Restaurant to the Phase 1 project boundary. <br /> For the Pedestrian Bridge portion of the project, the scope will include the site improvements <br /> associated with park improvements within the scope area. <br /> PHASE 1B - PEDESTRIAN UPGRADES Submittals to City of Everett <br /> 30% 60% 90% 100% <br /> LANDSCAPE ARCHITECTURE & IRRIGATION ' r " %' Sheets <br /> Task No. 19; Swift .7'4:;14,11;;;,. <br /> LA-XXX Site grading (To be transferred to KPFF Civil after X X <br /> 60%Submittal) <br /> LA-XXX Site hardscape and furnishing plans X X X X <br /> LA-XXX Site planting plans X X X <br /> LA-XXX Irrigation plans X X X <br /> LA-XXX Site, irrigation and planting construction details and X X X <br /> schedules <br /> 20. BNSF Permit support (KPFF) <br /> See Task 10 of this Scope of Work for BNSF Permit Support description and deliverables. Task <br /> 20 is associated with work for the Pedestrian Upgrades. KPFF shall determine the permits and <br /> agreements required and document the processes and timelines required for the anticipated <br /> Burlington Northern Santa Fe (BNSF) entitlements. This work shall include the addition of the <br /> necessary throw barriers and other tasks associated with pedestrians over the BNSF ROW. <br /> 21. Public Outreach (KPFF, LMN, and Swift) <br /> See Task 11 of this Scope of Work for the Public Outreach description and deliverables. Task <br /> 21 is associated with work for the Pedestrian Upgrades. <br /> KPFF Consulting Engineer November 10, 2014 <br /> Grand Avenue Park Pedestrian Bridge, Phase 1B Page 46 of 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.