My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF INC 12/16/2014
>
Contracts
>
Agreement
>
KPFF INC 12/16/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 1:29:22 PM
Creation date
8/21/2019 1:28:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF INC
Approval Date
12/16/2014
Council Approval Date
12/3/2014
Department
Administration
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge Design
Tracking Number
0001970
Total Compensation
$1,750,000.00
Contract Type
Agreement
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PHASE 2 - WEST MARINE VIEW DRIVE UTILITIES Submittals to City of Everett <br /> 30% 60% 90% 100% <br /> COMBINED SEWER AND STORMWATER COORDINATION 41..4 <br /> Task No. 25; HDR <br /> C-XXX Outfall Connection Piping Plan and Profile X X X X <br /> C-XXX Utility Details X X X X <br /> C-XXX Regulator Structure Plan and Details X X X X <br /> C-XXX Electrical and Instrumentation Plans for the Regulator X X X X <br /> Structure <br /> 26. Landscape Architecture & Irrigation Design (Swift) <br /> See Task 9 of this Scope of Work for Landscape Architecture and Irrigation Design description <br /> and deliverables. Swift Company LLC shall be providing urban design and landscape <br /> architecture including pedestrian hardscape from back side of curb including paving, and <br /> furnishings; planting soil, landscape planting and irrigation design documents, technical <br /> specifications, and construction details for all landscape areas of this project. These final plans <br /> and specification will be prepared in City of Everett preferred format with specific bid items to be <br /> determined in the future. Extent of project shall be assumed as the area from the edge of the <br /> Phase 1 project boundary to the end of the Phase 2 project boundaries. <br /> For the West Marine View Drive Utilites portion of the project, the scope will include site work <br /> associated with the return of the site to the condition prior to construction. <br /> Submittals to City of Everett <br /> PHASE 2 - WEST MARINE VIEW DRIVE UTILITIES 30% 60% 90% 100% <br /> LANDSCAPE ARCHITECTURE& IRRIGATION Sheets <br /> Task No. 26; Swift, <br /> LA-XXX Site grading (To be transferred to KPFF Civil after X X <br /> 60%Submittal) <br /> LA-XXX Site hardscape and furnishing plans X X X X <br /> LA-XXX Site planting plans X X X <br /> LA-XXX Irrigation plans X X X <br /> LA-XXX Site, irrigation and planting construction details and X X X <br /> schedules <br /> 27. Environmental Services (Landau) <br /> See Task 12 of this Scope of Work for the Environmental Services description and deliverables. <br /> Task 24 is associated with environmental services related to the West Marine View Drive <br /> Utilities. Environmental Services for both phases of work will be completed at the same time. <br /> KPFF Consulting Engineer November 10, 2014 <br /> West Marine View Drive Utilities, Phase 2 Page 53 of 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.