Laserfiche WebLink
Exhibit C-4 — Additional Engineering Services <br /> Scope of Work <br /> Legion Golf Course Stormwater Detention Project <br /> City of Everett Work Order #UP3620 <br /> Introduction/General/Background <br /> Murraysmith, formerly Murray, Smith & Associates, Inc., has developed the following scope of <br /> work and fee estimate for additional engineering services for the Legion Golf Course Stormwater <br /> Detention Project, City of Everett Project #UP3620-2. The scope and fee have been developed <br /> based on requested additional engineering to support the project, post construction, with <br /> consultation from iCon Golf and development of operational and control strategies. <br /> Scope of Services <br /> Consultant will perform the following services. <br /> Task 15 — Post Construction Project Support <br /> Objective: <br /> This task represents services provided by the Murraysmith team to support the project and the <br /> City, post construction, in the future planning of golf course stormwater infrastructure and in the <br /> operation and control strategies of the current stormwater detention improvements. Elements <br /> of this task include: <br /> 15.1 Post Construction Project Management <br /> This task is for general coordination of the project including coordination of the Murraysmith team <br /> and with the City Project Manager including correspondence and communication, invoicing and <br /> project status reports. <br /> 15.2 Post Construction Support by iCon Golf <br /> Services to support the City may include additional site visit(s) and consultation related to future <br /> course master planning that will incorporate stormwater improvements. Future course <br /> improvements or changes may include future stormwater ponds as defined in the pre-design Tech <br /> Memo (Murraysmith, July 2016). <br /> City of Everett MURRAYSMITH Legion Golf Stormwater <br /> July 2019 1 <br />