My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Murraysmith 8/15/2019 Amendment 4
>
Contracts
>
6 Years Then Destroy
>
2019
>
Murraysmith 8/15/2019 Amendment 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2019 10:42:48 AM
Creation date
8/22/2019 10:42:45 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Murraysmith
Approval Date
8/15/2019
Council Approval Date
8/7/2019
End Date
12/31/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Post Construction Support Operations Manual
Public Works WO Number
UP3620
Amendment/Change Order
Amendment
Amendment/Change Order Number
4
Total Compensation
$47,603.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Arlington
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Purchasing Cooperative Interlocal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit C-4 — Additional Engineering Services <br /> Scope of Work <br /> Legion Golf Course Stormwater Detention Project <br /> City of Everett Work Order #UP3620 <br /> Introduction/General/Background <br /> Murraysmith, formerly Murray, Smith & Associates, Inc., has developed the following scope of <br /> work and fee estimate for additional engineering services for the Legion Golf Course Stormwater <br /> Detention Project, City of Everett Project #UP3620-2. The scope and fee have been developed <br /> based on requested additional engineering to support the project, post construction, with <br /> consultation from iCon Golf and development of operational and control strategies. <br /> Scope of Services <br /> Consultant will perform the following services. <br /> Task 15 — Post Construction Project Support <br /> Objective: <br /> This task represents services provided by the Murraysmith team to support the project and the <br /> City, post construction, in the future planning of golf course stormwater infrastructure and in the <br /> operation and control strategies of the current stormwater detention improvements. Elements <br /> of this task include: <br /> 15.1 Post Construction Project Management <br /> This task is for general coordination of the project including coordination of the Murraysmith team <br /> and with the City Project Manager including correspondence and communication, invoicing and <br /> project status reports. <br /> 15.2 Post Construction Support by iCon Golf <br /> Services to support the City may include additional site visit(s) and consultation related to future <br /> course master planning that will incorporate stormwater improvements. Future course <br /> improvements or changes may include future stormwater ponds as defined in the pre-design Tech <br /> Memo (Murraysmith, July 2016). <br /> City of Everett MURRAYSMITH Legion Golf Stormwater <br /> July 2019 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.