My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 1/31/2020
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
TranTech Engineering LLC 1/31/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2024 11:04:20 AM
Creation date
2/4/2020 11:55:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
1/31/2020
Council Approval Date
1/22/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
PW3694
Tracking Number
0002205
Total Compensation
$1,803,078.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech 1/8/2024 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
TranTech Engineering LLC 8/11/2022 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Edgewater Creek Bridge Replacement <br /> Initial Scope Summary: <br /> 1. Project Management <br /> 2. Surveying <br /> 3. Geotechnical Engineering& Report <br /> 4. Environmental Permitting <br /> 5. Bridge Aesthetics <br /> 6. Utility Coordination <br /> 7. Constructability Review, Construction Schedule& Estimation <br /> 8. Traffic Control <br /> 9. Illumination& Signage <br /> 10. Community Outreach <br /> 11. Civil, Roadway&Drainage Design <br /> 12. Structural Design <br /> 13. Bidding Phase Support <br /> 14. Construction Phase Support <br /> Future Possible Scope(Optional Work), at City's discretion: <br /> • Construction Management <br /> Reports and plans,to the extent feasible, shall be developed in accordance with the latest edition <br /> and amendments of the following guidelines and documents: <br /> • AASHTO 2001, "A Policy of Geometric Design of Highways and Streets" <br /> • Washington State Department of Transportation, "Standard Specifications for Road and <br /> Bridge Construction" <br /> • Washington State Department of Transportation, "Design Manual" <br /> • Washington State Department of Transportation, "Bridge Design Manual" <br /> • AASHTO LRFD Bridge design Specifications—Seventh Edition <br /> • Washington State Department of Transportation, "Materials Laboratory Outline" <br /> • Washington State Department of Transportation, "Construction Manual" <br /> • Washington State Department of Transportation, "Local Agency Guidelines" <br /> • Highway Research Board's Manual entitled"Highway Capacity" <br /> • FCONSULTANT and Washington State Department of Transportation, "Manual on <br /> Uniform Traffic Control Devices for Streets and Highways" <br /> • Standard drawings prepared by City shall be used as a guide in all cases where they fit <br /> design conditions. <br /> • AASHTO "Guide for the Development of Bicycle Facilities" <br /> • WSDOT Highway Runoff Manual <br /> • WSDOT Hydraulics Manual <br /> Page 2 of 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.