My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 1/31/2020
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
TranTech Engineering LLC 1/31/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2024 11:04:20 AM
Creation date
2/4/2020 11:55:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
1/31/2020
Council Approval Date
1/22/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
PW3694
Tracking Number
0002205
Total Compensation
$1,803,078.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech 1/8/2024 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
TranTech Engineering LLC 8/11/2022 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Edgewater Creek Bridge Replacement <br /> WORK ELEMENT 1 PROJECT MANAGEMENT: <br /> This work element includes administration of the contract between the Consultant and the Agency, <br /> preparation of monthly progress reports and quality control, necessary for the Project. The task <br /> includes all administrative services needed to coordinate with the sub-consultant/s and to complete <br /> the Project on time and within budget. The following are the categorized activities associated with <br /> this work element: <br /> • Project Schedule Updating <br /> • Meetings and Meeting Minutes—approximately 17 team meetings is assumed for the <br /> duration of the design activities <br /> • Monthly Progress Reports,and Invoicing. Progress reports will contain a narrative that <br /> identifies and describes significant activities performed in the previous month and the <br /> significant planned activities for the upcoming month. <br /> • Design Team Management: <br /> a. Schedule and coordinate with design team. <br /> b. Prepare sub-consultant agreements, coordinate, budget and review the project <br /> progress and submittals. <br /> c. Prepare, monitor, and update project schedule. Monitor project budget. <br /> d. Prepare monthly billings,progress reports, and updated monthly project schedule. <br /> e. Maintain regular informal contact telephone discussions, and electronic mail. <br /> f. Obtain, with assistance from the City, rights of entry necessary for geotechnical <br /> studies, etc. <br /> Deliverables: <br /> • Progress Reports <br /> • Meeting Minutes <br /> • Monthly Invoicing <br /> • Project Schedule <br /> Page 3 of 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.