My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 1/31/2020
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
TranTech Engineering LLC 1/31/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2024 11:04:20 AM
Creation date
2/4/2020 11:55:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
1/31/2020
Council Approval Date
1/22/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
PW3694
Tracking Number
0002205
Total Compensation
$1,803,078.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech 1/8/2024 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
TranTech Engineering LLC 8/11/2022 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Edgewater Creek Bridge Replacement <br /> contamination will be noted. Analysis,testing, storage, and handling of potentially <br /> contaminated soil and ground water(either sampled or spoils from drilling)are beyond <br /> this scope of services. If contaminated soils and/or ground water are encountered,the <br /> material will be properly contained on-site for disposal as mutually agreed upon without <br /> additional cost to CONSULTANT. <br /> • All non-contaminated drilling spoils and related debris will be drummed on site and <br /> transported off site for disposal by the drilling subcontractor. <br /> • CONSULTANT assumes that they will attend 8 project coordination meetings other than <br /> the kick off meeting. <br /> • All Field explorations will be conducted between the hours of 9AM to 3PM. <br /> CONSULTANT assumes that establishment of traffic control will also abide by these <br /> hours. <br /> • No Phase 1 or Phase 2 Environmental Site Assessment will be completed by <br /> CONSULTANT. <br /> • All required rights of entry will be provided by the City of Everett or TranTech at no cost <br /> to CONSULTANT. <br /> • The borehole locations will be surveyed by others. <br /> • No stormwater infiltration testing will be conducted as part of this project. <br /> Relatively disturbed subsurface soil samples will be collected from the borings using <br /> the Standard Penetration Test(SPT)at intervals of 2.5 feet to 25 feet. Samples will be <br /> taken at 5-foot intervals below 25 feet. <br /> • The two wells installed as part of this investigation will be maintained throughout design <br /> and abandoned by the contractor during construction. <br /> • Groundwater monitoring will be completed over a period of 6 months. <br /> Deliverables: <br /> • Exploration Plan <br /> • Draft Geotechnical Report <br /> • Final Geotechnical Report <br /> • Geotechnical Addenda as necessary to Support PS&E Activities <br /> Page 13 of 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.