Laserfiche WebLink
City of Everett Edgewater Creek Bridge Replacement <br /> • The CLIENT will submit NEPA related information to WSDOT,tentatively scheduled to <br /> be prepared at or near the 30%PSE design level. <br /> • The CONSULTANT will encourage CLENT follow-up to WSDOT LPE approximately <br /> every 2-3 weeks after submittal to facilitate review. It is assumed the CLIENT will <br /> prepare information to submit the Preliminary CE form to WSDOT at or near the <br /> completion date of the 30%PSE and the Final CE form will be submitted to WSDOT at <br /> or near 60%PS&E submittal. <br /> • No additional federal or state permits or approvals or related documentation are scoped or <br /> known to be required for the PROJECT. <br /> • A noise assessment,air assessment, or visual assessment, will not be required from <br /> preliminary feedback obtained from WSDOT during the October 21,2019 early <br /> coordination conference call. <br /> Deliverables: <br /> • Preliminary NEPA CE Form and technical memos for Environmental Justice, Cultural <br /> Resources, Hazmat Memo(by others), and 4(f)De Minimis provided in Word or PDF <br /> format provided at or near 30%PSE submittal date for WSDOT submittal by CLIENT. <br /> • Review draft and final Critical Areas Technical Memo in PDF format provided at or near <br /> 60%PSE submittal for use in SEPA documentation and HPA. <br /> • Review draft and final SEPA Checklist in PDF format provided at or near 60%PSE <br /> submittal. <br /> • Final NEPA CE Form prepared for City of Everett signature and WSDOT submittal <br /> provided by the CONSULTANT at or near 60%PS&E submittal. <br /> 4.3 Restoration Drawings for Edgewater Park and Stream Buffer <br /> The PROJECT is expected to use a limited area of Edgewater Park for construction staging and <br /> access. Use of the park will be clarified based on discussions conducted during outreach to be <br /> performed by others. A restoration plan of the park lawn area and any disturbed stream buffer <br /> areas will be provided to remove construction-related temporary surfacing and other BMPs and <br /> restore lawn/mulch and native vegetation areas that are assumed to be disturbed by the project <br /> near the bridge. Drawings will be prepared under the supervision of a WA Professional <br /> Landscape Architect and will be included in the 90%and/or final PS&E set along with an <br /> opinion of construction cost. <br /> Assumptions: <br /> • The restoration drawings will address restoration of pre-project vegetation and soil <br /> conditions with available construction materials based on standard landscape construction <br /> practices and will include information for seeding/mulching and native plant vegetation <br /> restoration: drawing plan sheets and legends, details, and general notes will be included <br /> in the 90%and/or final PSE set. <br /> Page 17 of 42 <br />