Laserfiche WebLink
City of Everett Edgewater Creek Bridge Replacement <br /> • Restoration drawings may be appended in the Critical Areas Memo to indicate restoration <br /> of temporary stream buffer impacts. <br /> • No recreational park pavement or park structures will be disturbed or restored by the <br /> PROJECT. <br /> Deliverables: <br /> • Review final park restoration drawings and cost estimate provided at 90%and Final PSE. <br /> 4.4 Prepare JARPA Form for HPA and facilitate WDFW submittal and review: <br /> The CONSULTANT will prepare a Joint Aquatic Resources Permit Application(JARPA)and <br /> will provide electronic HPA submittal with the Critical Areas Memo and selected PSE drawings <br /> for HPA permit review,assumed to occur post SEPA issuance and at or near the 90%PSE phase. <br /> Assumptions: <br /> • A SEPA Determination will be noticed/processed/obtained by the CLIENT prior to the <br /> HPA JARPA submittal. <br /> • HPA JARPA submittal is assumed to be necessary due to work over Edgewater creek for <br /> the bridge replacement and no in-water work in the creek is assumed to occur. <br /> • HPA will be the only purpose of the JARPA application. <br /> • A supplemental scope of work to this agreement may be needed if any additional <br /> mitigation, design, or other documentation is required by WDFW(or other parties)other <br /> than containment measures for bridge demolition/construction,buffer vegetation <br /> restoration, or other readily available information provided under this scope of work. <br /> • No future meetings are assumed for HPA review, correspondence with the CLIENT and <br /> WDFW will be provided by email or phone by the CONSULTANT for approximately 4 <br /> weeks after the JARPA submittal to facilitate HPA review, assuming no more than a few <br /> hours per week of maximum CLIENT coordination assistance during this time. <br /> Deliverables: <br /> • CONSULTANT correspondence via phone and/or email. <br /> • Draft and final documents provided to the CLIENT by email to comprise the electronic <br /> HPA submittal package to be submitted to WDFW by email. This will include the <br /> Critical Area Memo(prepared under separate task item), SEPA determination(provided <br /> by CLIENT),JARPA form(as described herein), and selected design drawings and <br /> available information to illustrate and describe the project for HPA review. <br /> 4.5 NPDES Construction Stormwater General Permit(CSGP) <br /> The construction of the PROJECT is not expected to require an acre or more of cumulative land <br /> disturbance triggering CSGP Notice of Intent(NOI) submittal. However, submitting for permit <br /> coverage is advised since work will occur over Edgewater Creek and permit coverage could be <br /> Page 18 of 42 <br />