Laserfiche WebLink
City of Everett Edgewater Creek Bridge Replacement <br /> WORK ELEMENT 7 CONSTRUCTABILITY REVIEW, CONSTRUCTION <br /> SCHEDULE,AND ESTIMATION: <br /> This work element is performed by Ott-Sakai Construction Consultants(OS),to provide <br /> constructability review,construction schedule,and construction estimation services. <br /> The work element includes the following activities: <br /> 7.1 Constructability review <br /> OS will provide constructability review of the design team's prepared Plans, Estimate, and <br /> Specification(PS&E)package at 60%, & 90%design levels. <br /> 7.2 Construction CPM Schedule <br /> OS will prepare Construction Schedule at 60%and 100%PS&E design levels. <br /> 7.3 Construction Estimation <br /> OS will provide construction estimation cost of the design team's prepared PS&E package at <br /> 60%, 90%and 100% levels. <br /> Assumptions: <br /> Deliverables: <br /> • Constructability Review comments for PS&E packages at 60%, & 90%design levels. <br /> • Construction schedule at 60%and 100% levels. <br /> • Construction estimation for PS&E packages at 60%, 90%, & 100%design levels. <br /> Page 23 of 42 <br />