My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 1/31/2020
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
TranTech Engineering LLC 1/31/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2024 11:04:20 AM
Creation date
2/4/2020 11:55:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
1/31/2020
Council Approval Date
1/22/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
PW3694
Tracking Number
0002205
Total Compensation
$1,803,078.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech 1/8/2024 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
TranTech Engineering LLC 8/11/2022 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Edgewater Creek Bridge Replacement <br /> WORK ELEMENT 7 CONSTRUCTABILITY REVIEW, CONSTRUCTION <br /> SCHEDULE,AND ESTIMATION: <br /> This work element is performed by Ott-Sakai Construction Consultants(OS),to provide <br /> constructability review,construction schedule,and construction estimation services. <br /> The work element includes the following activities: <br /> 7.1 Constructability review <br /> OS will provide constructability review of the design team's prepared Plans, Estimate, and <br /> Specification(PS&E)package at 60%, & 90%design levels. <br /> 7.2 Construction CPM Schedule <br /> OS will prepare Construction Schedule at 60%and 100%PS&E design levels. <br /> 7.3 Construction Estimation <br /> OS will provide construction estimation cost of the design team's prepared PS&E package at <br /> 60%, 90%and 100% levels. <br /> Assumptions: <br /> Deliverables: <br /> • Constructability Review comments for PS&E packages at 60%, & 90%design levels. <br /> • Construction schedule at 60%and 100% levels. <br /> • Construction estimation for PS&E packages at 60%, 90%, & 100%design levels. <br /> Page 23 of 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.