My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 1/31/2020
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
TranTech Engineering LLC 1/31/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2024 11:04:20 AM
Creation date
2/4/2020 11:55:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
1/31/2020
Council Approval Date
1/22/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
PW3694
Tracking Number
0002205
Total Compensation
$1,803,078.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech 1/8/2024 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
TranTech Engineering LLC 8/11/2022 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Edgewater Creek Bridge Replacement <br /> WORK ELEMENT 6 UTILITY COORDINATION & DESIGN <br /> This Work Element is performed TranTech to provide utility coordination and potentially design <br /> for the project. <br /> 6.1 Utility Coordination <br /> Utilities owned and operated by other agencies/entities, other than the City,that are within the <br /> project corridor of the bridge improvements will be identified. TranTech will acquire and review <br /> record drawings of existing utilities within the project limits and define potential utility conflicts. <br /> For the purpose of preparing this scope of work, it is anticipated that up to four(4) utilities are <br /> located in the project corridor; electrical power(Snohomish City Public Utility), 6"natural gas <br /> pipeline (Puget Sound Energy), 10"watermain(City of Mukilteo), City of Everett Utilities for <br /> lift station, and franchise fiber optics that will need to be identified and verified. <br /> TranTech will schedule meetings with utilities to discuss the project and define utility needs and <br /> design criteria if the utility is impacted by the proposed bridge improvements. A total of four(4) <br /> meetings are anticipated under this subtask. Meeting will be conducted,and minutes will be <br /> prepared by TranTech. <br /> Based on the data acquired from the utilities, TranTech will develop preliminary alignment of <br /> the utilities to be carried by the new bridge,taking into consideration the roadway improvements <br /> and the respective utility standards to be provided by each utility. Furthermore,the development <br /> of plans for the relocation of existing utilities is dependent on the timely delivery and <br /> coordination of accurate and complete plans and information from each utility. <br /> Of particular interest, is the water main for the City of Mukilteo that may require other <br /> improvements at the west approach to the bridge. In that case, additional utility design services <br /> will be required and will be considered as a supplement to the current contract. <br /> Prepare Memorandum- Prepare a short technical memorandum to outline all the findings on the <br /> utilities at and around the project site. <br /> Assumptions: <br /> • No utility design is part of this Work Element <br /> Deliverables: <br /> • Utility coordination memorandum <br /> Page 22 of 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.