Laserfiche WebLink
City of Everett Edgewater Creek Bridge Replacement <br /> WORK ELEMENT 6 UTILITY COORDINATION & DESIGN <br /> This Work Element is performed TranTech to provide utility coordination and potentially design <br /> for the project. <br /> 6.1 Utility Coordination <br /> Utilities owned and operated by other agencies/entities, other than the City,that are within the <br /> project corridor of the bridge improvements will be identified. TranTech will acquire and review <br /> record drawings of existing utilities within the project limits and define potential utility conflicts. <br /> For the purpose of preparing this scope of work, it is anticipated that up to four(4) utilities are <br /> located in the project corridor; electrical power(Snohomish City Public Utility), 6"natural gas <br /> pipeline (Puget Sound Energy), 10"watermain(City of Mukilteo), City of Everett Utilities for <br /> lift station, and franchise fiber optics that will need to be identified and verified. <br /> TranTech will schedule meetings with utilities to discuss the project and define utility needs and <br /> design criteria if the utility is impacted by the proposed bridge improvements. A total of four(4) <br /> meetings are anticipated under this subtask. Meeting will be conducted,and minutes will be <br /> prepared by TranTech. <br /> Based on the data acquired from the utilities, TranTech will develop preliminary alignment of <br /> the utilities to be carried by the new bridge,taking into consideration the roadway improvements <br /> and the respective utility standards to be provided by each utility. Furthermore,the development <br /> of plans for the relocation of existing utilities is dependent on the timely delivery and <br /> coordination of accurate and complete plans and information from each utility. <br /> Of particular interest, is the water main for the City of Mukilteo that may require other <br /> improvements at the west approach to the bridge. In that case, additional utility design services <br /> will be required and will be considered as a supplement to the current contract. <br /> Prepare Memorandum- Prepare a short technical memorandum to outline all the findings on the <br /> utilities at and around the project site. <br /> Assumptions: <br /> • No utility design is part of this Work Element <br /> Deliverables: <br /> • Utility coordination memorandum <br /> Page 22 of 42 <br />