Laserfiche WebLink
City of Everett Edgewater Creek Bridge Replacement <br /> WORK ELEMENT 9 ILLUMINATION, PEDESTRIAN SIGNAL AND SIGNAGE: <br /> This work element is performed by TranTech,to provide illumination,ped signal and permanent <br /> signage design services. <br /> Based on the City's selected Alternative, TranTech will provide design services associated with <br /> illumination,pedestrian(Ped) signal and permanent signing design. The illumination design is <br /> intended for the Bridge and its immediate approaches and the ped signal is intended for safe <br /> crossing of the Mukilteo Blvd. in the vicinity of the Park that is located at northeast corner of the <br /> project site. <br /> TranTech team will prepare 30%, 60%, 90%, 98%and bid ready plans, specifications, and <br /> engineering cost estimates. <br /> This work element includes the following tasks: <br /> 9.1 Illumination <br /> The design team will discuss guidelines and criteria with the City. The team will develop a <br /> design basis report outlining the lighting design approach, design criteria,target luminance and <br /> luminance levels,power densities,wiring schematics, sources (discuss with the PUD service <br /> types and locations), color temperature and control intent. <br /> Following the input from the City,the lighting engineer will develop illumination PS&E, <br /> lighting schedules and provide required fixture catalog cuts. <br /> 9.2 Pedestrian Signal <br /> The design team will provide PS&E documents for a pedestrian signal to be installed in the <br /> vicinity of the Park that is located at the northeast corner of the project site. This crossing is <br /> especially important for the residences on the Upland Ave which is located on the southeast <br /> corner of the project site. <br /> 9.3 Permanent Signing <br /> The design team will prepare final permanent signing sheets to reflect the final signing conditions <br /> when the project is completed. This effort will include an inventory of existing signs, upgrading <br /> sign messages as necessary,preparation of signing plans,sign specification sheets,and sign details <br /> for non-standard signs. The final signing plans will include signs for motorists, bicycles, and <br /> pedestrians. <br /> Assumptions: <br /> Deliverables: <br /> • Illumination PS&E at 60%, 90%, & 100%design levels. <br /> • Pedestrian Signal PS&E at 60%, 90%, & 100%design levels. <br /> • Permanent Signing PS&E at 60%, 90%, & 100%design levels. <br /> Page 25 of 42 <br />