Laserfiche WebLink
City of Everett Edgewater Creek Bridge Replacement <br /> Task 113.2 -60%Plans and Opinion of Cost <br /> The 60%plans will consist of project plan and profile information that are considered to be <br /> constructible as shown,but not all of the information needed for construction, such as curb return <br /> elevations and construction notes, will be provided. Some detail sheets and all landscaping and <br /> traffic control sheets are excluded from this submittal. <br /> Work Elements: <br /> • Prepare 60%design-level plans. <br /> • Prepare 60%design-level opinion of cost. <br /> Assumptions: <br /> • Specifications will not be provided at the 60%design-level. <br /> Deliverables: <br /> • 60%design-level plans(half-size (11"x17"), PDF) <br /> • 60%design-level opinion of cost(PDF) <br /> Task 11.3.3 - 90% Plans and Opinion of Cost <br /> The 90%plans will consist of project plan and profile information and construction notes, <br /> elevation information, and details needed for construction. <br /> Deliverables: <br /> • 90%design-level plans (half-size (11"x17"),PDF) <br /> • 90%design-level opinion of cost(PDF) <br /> • 90%design-level specifications(PDF) <br /> Task 11.3.4-Final Plans and Opinion of Cost <br /> The final plans will be bid-ready and include any comments received at the 90% submittal <br /> Deliverables: <br /> • Bid-ready plans (1 signed, full-size (22"x34")hard copy; 1 signed, half-size(11"x17") <br /> hard copy; signed,half-size PDF) <br /> • Final opinion of cost(1 hard copy, PDF) <br /> • Bid-ready specifications(1 hard copy, PDF) <br /> Page 36 of 42 <br />