My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 1/31/2020
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
TranTech Engineering LLC 1/31/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2024 11:04:20 AM
Creation date
2/4/2020 11:55:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
1/31/2020
Council Approval Date
1/22/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
PW3694
Tracking Number
0002205
Total Compensation
$1,803,078.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech 1/8/2024 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
TranTech Engineering LLC 8/11/2022 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Edgewater Creek Bridge Replacement <br /> • Wall Plan and Profile (3 sheets, not to scale) <br /> • Channelization and Signing Plan and Details (2 sheets, 1"= 20' scale) <br /> These plans will include sign tables documenting sign type, size and location. One sheet <br /> to document details for channelization and signing is included. <br /> • Landscaping and Irrigation Plan and Details (6 sheets, 1" =20' scale) <br /> Specifications <br /> The Consultant will prepare Contract Provisions ("Specifications") for the project. These will <br /> include Special Provisions for the items of work that are not covered by the 2020 <br /> WSDOT/APWA Standard Specifications, any City of Everett General Requirements, and bid <br /> and contract forms. <br /> Opinion of Cost <br /> The opinion of cost will be based on unit prices, and incorporate contingencies to account for the <br /> level of completeness of plan preparation for each submittal, and to reflect past experience on <br /> similar projects within the region. <br /> 11.3.1 30% Plans and Opinion of Cost <br /> The 30%plans will consist of project footprint(plan view) information, Typical sections, and <br /> wall profiles details, drainage profiles, landscaping sheets, and traffic control sheets are excluded <br /> from this submittal. The 30%design-level plans will consist of approximately twelve (12) plan <br /> sheets. <br /> Work Elements: <br /> • Prepare 30% design-level plans. <br /> • Prepare 30%design-level opinion of cost. <br /> Assumptions: <br /> • The City will finalize the general geometric layout of the proposed improvements <br /> through the review of the 30% submittal. The layout shall not be substantially modified <br /> in a later design phase. A substantial change in the layout will constitute a change in <br /> scope and will allow the Consultant to negotiate additional compensation for the change. <br /> • Proposed improvements will extend beyond the existing right-of-way. Right-of-way <br /> plans will be developed after comments are incorporated from the 30%review. <br /> Deliverables: <br /> • 30%design-level plans (half-size (11"x17"), PDF) <br /> • 30%design-level opinion of cost(PDF) <br /> • Draft ROW plans and exhibits <br /> Page 35 of 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.