My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 1/31/2020
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
TranTech Engineering LLC 1/31/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2024 11:04:20 AM
Creation date
2/4/2020 11:55:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
1/31/2020
Council Approval Date
1/22/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
PW3694
Tracking Number
0002205
Total Compensation
$1,803,078.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech 1/8/2024 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
TranTech Engineering LLC 8/11/2022 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IOW <br /> Washington State Transportation Building <br /> 0 Department of Transportation 310 Maple Park Avenue S.E. <br /> P.O.Box 47300 <br /> Olympia,WA 98504-7300 <br /> 360-705-7000 <br /> TTY: 1-800-833-6388 <br /> www.wsdot.wa.gov <br /> July 19, 2019 <br /> Ott-Sakai&Associates, LLC <br /> PO Box 247 <br /> Mountlake Terrace, WA 98042 <br /> Subject: Renewal of 2017 Negotiated and Provisional Rate <br /> Dear Janiece Christian: <br /> WSDOT has agreed to renew your 2017 provisional rate(ICR)of 70% for one additional year. <br /> This renewal is provisional for the 2019/2020 (July 1st, 2019 to June 30th 2020)time period. In <br /> addition, the firm agrees to make the following adjustments to the (Nov2018/Apr2019) <br /> financials provided to the WSDOT audit office: <br /> 1. Removed the bonus as this was attributable to 2018 <br /> 2. Update vacation figures [accrual was most likely before November 2018] <br /> 3. Adjust the labor to the lower rates for the indirect labor <br /> 4. Remove the $12k professional fees - unallowable unless specifically attributable <br /> as direct costs <br /> The provisional rate will not be extended beyond the 2019/2020 time period described above. <br /> The firm will be required to provide either aa Cognizant Report or CPA Report for any future <br /> time periods. This rate will be applicable for Washington Local Agency and WSDOT Contracts. <br /> This rate may be subject to additional review if considered necessary by WSDOT. <br /> Costs billed to agreements/contracts will still be subject to audit of actual costs, based on the <br /> terms and conditions of the respective agreement/contract. <br /> This was not a cognizant review. Any other entity contracting with the firm is responsible for <br /> determining the acceptability of the ICR. <br /> If you have any questions, feel free to contact our office at (360) 705-7019 or via email <br /> consultantrates(a wsdot.wa.aov. <br /> Regards; <br /> ERIK K. JONSON <br /> Contract Services Manager <br /> EKJ: <br /> Acceptance ICR Provisional <br />
The URL can be used to link to this page
Your browser does not support the video tag.