Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality RetrofitDivision B – BID DESCRIPTIONS August 2023 <br />WO No. – UP3745 SP - 26 <br /> <br />except work described in items (a) and (b) below, which may be initiated by the Inspector in <br />the field. <br />In lieu of the preceding prescribed method of determining payment for Force Account work, <br />payment may be made at unit prices or lump sum prices agreed to by the Engineer and the <br />Contractor prior to beginning the Force Account work. <br />The following miscellaneous construction work will be paid for by Force Account as specified <br />in 1-09.6 FORCE ACCOUNT. For the purpose of providing a common Proposal for all <br />Bidders, and for that purpose only, the City has estimated an amount and included it in the <br />bid item for Force Account work to become part of the total Bid by the Contractor. <br />(a) Cost for additional excavation, fittings, and labor to make grade adjustments to <br />the new watermain for unknown underground conflicts and conflicts due to being <br />unmarked or mismarked utilities in the field. <br />(b) Restoration of existing special private improvements including, but not limited to, <br />brick or stone walkways, decorative concrete walks or driveways, concrete <br />masonry or stone walls, rockeries, fences, landscape plantings, including but not <br />limited to, hedges, trees, flowerbeds, irrigation systems, yard lighting, rockeries, <br />retaining walls, handrails, or steps. <br />(c) Control Density Fill backfill, where directed by the Engineer, to fill trenches and <br />excavations where conventional backfill cannot be adequately compacted. <br />(d) Adjust or replace water or sanitary sewer services to resolve conflict with new <br />stormwater systems <br /> <br />Bid Item 6 - Traffic Control Labor <br />Measurement and Payment: Unit Price per Hour (HR) <br />This unit price bid item includes all costs associated with traffic control labor as identified in <br />1-10.3 FLAGGING, SIGNS, AND ALL OTHER TRAFFIC CONTROL DIVICES of these <br />Special Provisions. <br />Furnish all personnel for flagging to control traffic, including pedestrians, during construction <br />operations in accordance with Section 1-10 of the Standard Specifications (as amended by <br />the Special Provisions), the Plans, approved traffic control plans, these Special Provisions <br />and as directed by the City. <br />Also included is cost associated with preparation and distribution of public notices involving <br />parking, street access or traffic issues. <br /> <br />Bid Item 7 - Maintenance and Protection of Traffic Control <br />Measurement and Payment: Lump Sum (LS) <br />Measurement for Maintenance and Protection of Traffic Control shall be the ratio of the <br />number of working days completed to the total number of working days authorized in the <br />Contract. <br />This lump sum bid item includes the maintenance and protection of traffic control materials, <br />tools, and equipment necessary to accomplish the Work in accordance with 1-10.3(2) <br />MAINTENANCE AND PROTECTION OF TRAFFIC CONTROL, including yet not limited to, <br />signs, barricades, cones, flashers, reader boards, and temporary pavement markings. This <br />bid item also includes the Traffic Control Supervisor, when provided. <br />Bid Item 8 - Trench Excavation Safety Systems <br />Measurement and Payment: Square Foot (SF)