Laserfiche WebLink
• Public Works Board AMORTIZATION SCHEDULE <br /> Department of Community, Trade,and Economic Development This Amorization Schedule does not reflect forgivable loE <br /> 210 11th Ave.SW,Suite G2,P.O.Box 48319, Olympia, WA 98504-8319 <br /> Pa ment Schedule: <br /> Year Due Principal Interest Payment <br /> 1 6/1/2013 0.00 1,083.96 1,083.96 <br /> 2 6/1/2014 128,461.00 7,485.64 135,946.64 <br /> 3 6/1/2015 548,418.84 27,572.56 575,991.40 <br /> 4 6/1/2016 548,418.83 46,615.60 595,034.43 <br /> 5 6/1/2017 548,418.83 43,873.51 592,292.34 <br /> 6 6/1/2018 548,418.84 41,131.41 589,550.25 <br /> 7 6/1/2019 548,418.83 38,389.32 586,808.15 <br /> 8 6/1/2020 548,418.83 35,647.23 584,066.06 <br /> 9 6/1/2021 548,418.84 32,905.13 581,323.97 <br /> 10 6/1/2022 548,418.83 30,163.03 578,581.86 <br /> 11 6/1/2023 548,418.83 27,420.94 575,839.77 <br /> 12 6/1/2024 548,418.83 24,678.85 573,097.68 <br /> 13 6/1/2025 548,418.84 21,936.75 570,355.59 <br /> 14 6/1/2026 548,418.83 19,194.66 567,613.49 <br /> 15 6/1/2027 548,418.83 16,452.57 564,871.40 <br /> 16 6/1/2028 548,418.84 13,710.47 562,129.31 <br /> 17 6/1/2029 548,418.83 10,968.38 559,387.21 <br /> 18 6/1/2030 548,418.83 8,226.28 556,645.11 <br /> 19 6/1/2031 548,418.84 5,484.19 553,903.03 <br /> 20 6/1/2032 548,418.83 2,742.09 551,160.92 <br /> Total $10,000,000.00 $455,682.57 $10,455,682.57 <br /> Client: City of Everett <br /> Loan Number: PC 13-961-008 <br /> Project Description: Everett Water Pollution Control Facility Expansion <br /> Initial Loan Amount: $10,000,000.00 <br /> Initial Local Match: $20,865,000.00 <br /> Initial Match%: 208.65% <br /> Initial Interest Rate: 0.50% <br /> Date Loan was Authorized: 7/7/2011 <br /> Loan Amount at Closing: <br /> Local Match at Closing: $0.00 <br /> Match%at Closing: 0.00% <br /> Interest Rate at Closing: <br /> Closing Date: 9/18/2017 <br /> Loan Type: Construction NT <br /> Loan Term(Years): 20 <br /> Years Principal is Initially Deferred: 1 <br /> Extra Principal Deferral Type: <br /> Extra Principal Deferral Start Year: 0 <br /> Extra Principal Deferral End Year: 0 <br />