My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 5/15/2019
>
Contracts
>
6 Years Then Destroy
>
2020
>
TranTech Engineering LLC 5/15/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 9:51:30 AM
Creation date
6/4/2019 10:27:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
5/15/2019
Council Approval Date
5/1/2019
End Date
12/31/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Design of Maple Heights Seismic Retrofit
Tracking Number
0001812
Total Compensation
$267,925.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech Engineering LLC 4/15/2020 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The CITY will provide all real property services for the PROJECT and obtain all property rights <br /> necessary to design and construct the Project. <br /> • The CONSULTANT is responsible only for meeting deadlines for their tasks and has no <br /> control over those portions of the schedule related to the tasks performed by the CITY or <br /> any third party that is retained by the CITY.The CONSULTANT will work with the CITY to the <br /> greatest extent feasible to maintain overall PROJECT schedule. <br /> • Additional subsurface investigation and remedial action associated with any hazardous <br /> wastes located within the PROJECT limits are not within this SCOPE. CONSULTANT will <br /> provide documentation support as requested based upon data from existing subsurface <br /> investigation. Because of the inherent uncertainties in subsurface evaluations, <br /> underground conditions may occur that could affect total PROJECT cost and/or execution. <br /> These conditions and cost/execution effects are not the responsibility of the CONSULTANT. <br /> • The CONSULTANT will use the following computer software in the performance of the <br /> engineering and design work for this contract: <br /> o Engineering software: SAP2000 or CSI Bridge; Group v.2016; LPile v.2016; XTRACT; <br /> spColumn v.7; Mathcad v.15 <br /> o CAD software: AutoCAD and Civil 3D 2017 <br /> o Scheduling software: Microsoft Project or Excel <br /> o Current Microsoft Office, Word, Excel <br /> • English units for plans, engineering, and environmental documents <br /> • The CITY and review agencies will take up to ten business days to review milestone <br /> submittals. The CITY will be responsible for collecting CITY and review agency comments, <br /> resolving conflicting comments, and submitting one set of consolidated comments to the <br /> CONSULTANT for each submittal. <br /> • Designated CITY staff will lead and participate in all stakeholder and designated team <br /> meetings throughout the life of contract and review and comment on all deliverables <br /> outlined in contract. <br /> • Utility potholing is not included in this Scope. Potholing work will be covered in an <br /> amendment as out-of-scope work to the PS&E Contract if utility potholing is deemed <br /> necessary and essential when the existing utility information is deemed insufficient to <br /> identify existing utilities correctly. <br /> Maple Heights Bridge Seismic Retrofit 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.