My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 5/15/2019
>
Contracts
>
6 Years Then Destroy
>
2020
>
TranTech Engineering LLC 5/15/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 9:51:30 AM
Creation date
6/4/2019 10:27:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
5/15/2019
Council Approval Date
5/1/2019
End Date
12/31/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Design of Maple Heights Seismic Retrofit
Tracking Number
0001812
Total Compensation
$267,925.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech Engineering LLC 4/15/2020 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Performed by the CITY <br /> Throughout the duration of the PROJECT, the CITY will perform services, furnish information, <br /> and answer questions on CITY standard procedures for plan preparation. <br /> The following services will be performed by the CITY: <br /> • CITY will provide available as-built plans, bridge records, inspection reports, previous study <br /> findings and calculations, etc. <br /> • If necessary, CITY will provide meeting location/conference room for all stakeholder <br /> meetings throughout the life of this contract. <br /> • If necessary, Designated CITY staff will lead and participate in all stakeholder meetings <br /> throughout life of contract. <br /> • Review and comment on all deliverables outlined in contract. <br /> Milestones Schedule <br /> The schedule of milestones is shown below. The schedule below assumes NTP is received by <br /> December 17th, 2018. Delayed NTP will affect the dates shown. <br /> Milestone Date <br /> Draft CDR July 1, 2019 <br /> Draft CDR Comments Due July 15, 2019 <br /> Final CDR July 29, 2019 <br /> Draft 60% PS&E September 30, 2019 <br /> Draft 60% PS&E Comments Due October 15, 2019 <br /> Draft 90% PS&E December 15, 2019 <br /> Draft 90 PS&E Comments Due January 6, 2020 <br /> Final PS&E January 27, 2020 <br /> * - Days are Calendar Days <br /> CDR: Conceptual Design Report <br /> Maple Heights Bridge Seismic Retrofit 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.