Laserfiche WebLink
Task 2 Data Collection and Field Verification <br /> Task 2.1 Bridge Data Collection and Field Verification <br /> The CONSULTANT will gather available information pertinent to the PROJECT, including and not <br /> limited to as-built drawings, bridge inspection reports, maintenance records, load rating, and <br /> utilities on and adjacent to the bridge. <br /> A site visit of the bridge will be conducted to verify the information shown in the as-built <br /> drawings and to document any additional or missing as-built information. The verification will <br /> be limited to the information required for the seismic analysis and limited to visual inspection <br /> of elements above the ground and out of the water only.The CONSULTANT will inform the CITY <br /> of any major discrepancies observed between the site visit and the inspection report. <br /> Assumptions: <br /> • The CITY will provide the available existing information on the PROJECT from CITY <br /> records. <br /> • The site visit is not a bridge inspection. <br /> • No traffic control measure is anticipated. <br /> • Site visit to verify as-built information is limited to items readily visible and <br /> accessible without special equipment (lift or UBIT) or ladders. <br /> Deliverables <br /> • A brief field visit report describing and documenting overall existing conditions of <br /> the bridge and any discrepancies from the as-built drawings. <br /> • Photos of the bridge and site conditions for inclusion in the Concept Design Report. <br /> Maple Heights Bridge Seismic Retrofit 7 <br />