My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 5/15/2019
>
Contracts
>
6 Years Then Destroy
>
2020
>
TranTech Engineering LLC 5/15/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 9:51:30 AM
Creation date
6/4/2019 10:27:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
5/15/2019
Council Approval Date
5/1/2019
End Date
12/31/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Design of Maple Heights Seismic Retrofit
Tracking Number
0001812
Total Compensation
$267,925.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech Engineering LLC 4/15/2020 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Seismic Retrofit Specifications <br /> The CONSULTANT will use the CITY of Everett Standard Specifications 2017 in preparing the <br /> Project's specifications and Project Manual. The CONSULTANT will modify the standard <br /> specifications by preparing contract special provisions. In addition, the CONSULTANT will <br /> prepare Special Provisions for contract specific requirements when the standard specifications <br /> do not cover a certain work element. <br /> For the 60%submittal and all subsequent submittals, the CONSULTANT will submit a complete <br /> Project Specifications Manual including Divisions 0-9 with a bid form, special provisions and <br /> general special provisions that apply to the Project. The CONSULTANT will stamp the second <br /> page of the Project Specifications Manual. <br /> Assumptions: <br /> • City will supply a "boilerplate" version of the project specifications manual which will <br /> include a cover page, advertisement, signature page, a table of contents, Division 0, <br /> standard and general special provisions for Divisions 1 through 9, and standard CITY <br /> Appendix items. <br /> • For the technical special provisions, Divisions 2 through 9 and portions of Division 1 <br /> including environmental requirements and maintenance of traffic, City boilerplate <br /> files are provided for the CONSULTANT's use. The CONSULTANT is responsible for <br /> evaluating the applicability of each section to their specific contract. The <br /> CONSULTANT is responsible for the technical special provisions of the contract. <br /> • The final submittal for PROJECT advertisement will reflect the most recent version of <br /> City's boilerplate which may change at any point during design development. <br /> Seismic Retrofit Engineer's Estimate <br /> The CONSULTANT will prepare an engineer's estimate for the PROJECT at the 60%, 90%, final <br /> design and bid ready levels of completion. The estimates will be prepared using documented <br /> unit costs, lump-sum prices, and from Consultant's experience on similar projects.The <br /> CONSULTANT will submit unit price documentation for nonstandard work items and review and <br /> modify, as needed, the appropriateness of the unit costs, lump-sum prices, and other cost data <br /> that the CONSULTANT uses. After the 90%design is completed, the Consultant will conduct a <br /> bottom-up independent cost estimate in addition to the unit price cost estimate.This estimate <br /> is intended to provide additional cost certainty before construction contract advertisement. <br /> PROJECT cost estimates will include appropriate contingency factors to account for PROJECT <br /> uncertainties that cannot be accounted for at the PROJECT's various engineering stages. <br /> Maple Heights Bridge Seismic Retrofit 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.