Laserfiche WebLink
City of Everett Edgewater Creek Bridge Replacement <br /> required by ecology due to potential water quality risks to the stream. If no permit is obtained <br /> prior to construction, Ecology could require coverage during construction and cause construction <br /> delays. <br /> Assumptions: <br /> • The CONSULTANT will prepare and submit a NOI electronically after issuance of <br /> SEPA exemption or SEPA determination. <br /> • The CLIENT will be provided with applicant forms after submittal and will need to sign <br /> and return forms to Ecology and publish the required public notices. <br /> • Permit coverage will be transferred to the Operator(Contractor) after bid award and <br /> before construction. All permit fees will be paid by permittee and transfer of coverage <br /> will be included in the project manual. <br /> • The Stormwater Pollution Protection Plan (SWPPP) will be indicated to be provided by <br /> Contractor in specifications and permit compliance will be addressed by Contractor. <br /> Deliverables: <br /> • Draft and final NOI submitted electronically by CONSULTANT. <br /> • Specification language for Contractor compliance and permittee responsibility. <br /> Page 19 of 42 <br />