My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 1/31/2020
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
TranTech Engineering LLC 1/31/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2024 11:04:20 AM
Creation date
2/4/2020 11:55:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
1/31/2020
Council Approval Date
1/22/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
PW3694
Tracking Number
0002205
Total Compensation
$1,803,078.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech 1/8/2024 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
TranTech Engineering LLC 8/11/2022 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Edgewater Creek Bridge Replacement <br /> required by ecology due to potential water quality risks to the stream. If no permit is obtained <br /> prior to construction, Ecology could require coverage during construction and cause construction <br /> delays. <br /> Assumptions: <br /> • The CONSULTANT will prepare and submit a NOI electronically after issuance of <br /> SEPA exemption or SEPA determination. <br /> • The CLIENT will be provided with applicant forms after submittal and will need to sign <br /> and return forms to Ecology and publish the required public notices. <br /> • Permit coverage will be transferred to the Operator(Contractor) after bid award and <br /> before construction. All permit fees will be paid by permittee and transfer of coverage <br /> will be included in the project manual. <br /> • The Stormwater Pollution Protection Plan (SWPPP) will be indicated to be provided by <br /> Contractor in specifications and permit compliance will be addressed by Contractor. <br /> Deliverables: <br /> • Draft and final NOI submitted electronically by CONSULTANT. <br /> • Specification language for Contractor compliance and permittee responsibility. <br /> Page 19 of 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.