My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 1/31/2020
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
TranTech Engineering LLC 1/31/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2024 11:04:20 AM
Creation date
2/4/2020 11:55:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
1/31/2020
Council Approval Date
1/22/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
PW3694
Tracking Number
0002205
Total Compensation
$1,803,078.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech 1/8/2024 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
TranTech Engineering LLC 8/11/2022 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Edgewater Creek Bridge Replacement <br /> Assumptions: <br /> • City and Enviro-issues will organize the open house and publicize and arrange for the <br /> meetings and presentations. MAKERS will assist in conducting the sessions. <br /> • MAKERS will not be involved in lighting, electrical or utilities work. <br /> • The budget assumes 6 meetings or conferences with the engineering/City team and one <br /> public event(open house). <br /> • The budget for refinement of the 60%and 90%documents may need to be adjusted <br /> depending on the complexity of the design chosen by the City. <br /> • The budget assumes that the 60%, 90%and 100%documents will build on previous <br /> phases and that there is no significant change in design direction. <br /> • The engineering team will provide MAKERS with CAD layouts,templates and <br /> numbering to meet the requirements of the final bid document formatting. <br /> Deliverables: <br /> • Concept sketches for the open house <br /> • 30%Documents of urban design (Aesthetic)elements in digital format(CAD)as <br /> provided by the engineering team. <br /> • 60%Documents(plans, specifications and estimates)of urban design(Aesthetic) <br /> elements in digital format(CAD) as provided by the engineering team. <br /> • 90%Documents of urban design(Aesthetic)elements in digital format(CAD)as <br /> provided by the engineering team. <br /> • 100%Documents of urban design(Aesthetic) elements in digital format(CAD) as <br /> provided by the engineering team. <br /> Page 21 of 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.