Laserfiche WebLink
City of Everett Edgewater Creek Bridge Replacement <br /> Assumptions: <br /> • City and Enviro-issues will organize the open house and publicize and arrange for the <br /> meetings and presentations. MAKERS will assist in conducting the sessions. <br /> • MAKERS will not be involved in lighting, electrical or utilities work. <br /> • The budget assumes 6 meetings or conferences with the engineering/City team and one <br /> public event(open house). <br /> • The budget for refinement of the 60%and 90%documents may need to be adjusted <br /> depending on the complexity of the design chosen by the City. <br /> • The budget assumes that the 60%, 90%and 100%documents will build on previous <br /> phases and that there is no significant change in design direction. <br /> • The engineering team will provide MAKERS with CAD layouts,templates and <br /> numbering to meet the requirements of the final bid document formatting. <br /> Deliverables: <br /> • Concept sketches for the open house <br /> • 30%Documents of urban design (Aesthetic)elements in digital format(CAD)as <br /> provided by the engineering team. <br /> • 60%Documents(plans, specifications and estimates)of urban design(Aesthetic) <br /> elements in digital format(CAD) as provided by the engineering team. <br /> • 90%Documents of urban design(Aesthetic)elements in digital format(CAD)as <br /> provided by the engineering team. <br /> • 100%Documents of urban design(Aesthetic) elements in digital format(CAD) as <br /> provided by the engineering team. <br /> Page 21 of 42 <br />