My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 1/31/2020
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
TranTech Engineering LLC 1/31/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2024 11:04:20 AM
Creation date
2/4/2020 11:55:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
1/31/2020
Council Approval Date
1/22/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
PW3694
Tracking Number
0002205
Total Compensation
$1,803,078.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech 1/8/2024 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
TranTech Engineering LLC 8/11/2022 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Washington State Transportation Building <br /> 71 Department of Transportation 310 Maple Park Avenue S.E. <br /> P.O.Box 47300 <br /> Olympia,WA 98504-7300 <br /> 360-705-7000 <br /> TTY: 1-800-833-6388 <br /> www.wsdot.wa.gov <br /> May 9, 2019 <br /> Makers Architecture and Urban Design LLP <br /> 500 Union Street, Suite 700 <br /> Seattle, WA 98101 <br /> Subject: Acceptance FYE 2018 ICR—Risk Assessment Review <br /> Dear Gretchen Messer: <br /> Based on Washington State Department of Transportation's (WSDOT) Risk <br /> Assessment review of your Indirect Cost Rate (ICR), we have accepted your proposed <br /> FYE 2018 ICR of 169.97%. These rates are applicable to Washington Local Agency <br /> Contracts only. These rates may be subject to additional review if considered necessary <br /> by WSDOT. Your ICR must be updated on an annual basis. <br /> Costs billed to agreements/contracts will still be subject to audit of actual costs, based <br /> on the terms and conditions of the respective agreement/contract. <br /> This was not a cognizant review. Any other entity contracting with your firm is <br /> responsible for determining the acceptability of the ICR. <br /> If you have any questions, feel free to contact our office at(360)705-7019 or via email <br /> consu ltantrates(a,wsdot.wa.aov. <br /> Regards; <br /> ERIK K. JONSON <br /> Contract Services Manager <br /> EKJ:mya <br /> Acceptance ICR Audit Office Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.